Damage to Goods During Transportation in SAP

                         If goods are damaged during transportation, leading to their destruction, we must report this as scrapping so that the system can arrive at the correct quantity of stock in transfer or stock in transit.

 


We can report scrapping in the following ways:

Ø  Reverse the removal from storage at the issuing plant and then post the scrapping of the material at the issuing plant. The scrapping is posted on a value basis in the issuing plant.

 Ø  Place the full quantity of the goods into storage at the receiving plant and then post the scrapping at the receiving plant. The scrapping is posted on a value basis at the receiving plant.

Note: It is important that the quantity destroyed does not remain in stock in transfer or stock in transit, but is reported in the system as scrapped.