The info record
contains information on a specific material and a vendor supplying the
material.
For example, the vendor's
current pricing is stored in the info record.
The info record allows
buyers to quickly determine:
Which materials have been
previously offered or supplied by a specific vendor which vendors have offered
or supplied a specific material
Content of an Info Record
The info record contains:
Ø Data such as prices and conditions
that you can store for the relevant purchasing organization or plant.
Ø Number of the last purchase order
Ø Tolerance
limits for overdeliveries and underdeliveries
Ø Planned delivery time (lead time
required by the vendor to deliver the material)
Ø Vendor evaluation data
Ø Indicator
showing whether the vendor counts as the regular vendor for the material
Ø Vendor
sub-range to which the material belongs
Ø Availability
period during which the vendor
can supply the material
Ø The
info record contains quotation and ordering data. The data in the info record
(prices for example) is also used as default data for purchase orders.
Ø For
instance, you can store the current and future quotation conditions (discounts,
fixed costs etc. ) in the info
record, in order to be able to copy them into Pos .
You can also maintain the vendor’s conditions directly in the info record.
Organizational Levels:
An info record can apply
to the following organizational levels:
Purchasing organization
Plant
Types of Info Records:
Standard : A standard
info record contains information for standard purchase orders. The info records
can be created for materials and services with and without master records.
Subcontracting : A
subcontractor info record contains ordering information for subcontract orders.
For example, if you subcontract the assembly of a component, the subcontractor
info record would include the vendor's (subcontractor's) price of assembling
the component.
Pipeline : A pipeline
info record contains information on a vendor's commodity that is supplied
through a pipeline or pipes (oil or water) or by similar means (electricity
through the mains). The info record contains the vendor's price for the
consumption of such commodities by the buyer ("pipeline withdrawals").
You can store withdrawal/usage prices for different validity periods.
No comments:
Post a Comment